.jpg)
Location
Chicagoland, IL
Timeline
2023
Client
CTA
PROJECT OVERVIEW
About This Project
John Burns is the Prime Contractor for work on the Damen Substation, Barry Substation, Haymarket Station, Canal Tie-House and Belmont Crossover projects.
Markets
Power & Utility
Need a Similar Solution?
Contact our Illinois team to discuss your infrastructure project requirements and get expert guidance.
Illinois
Scope Of Work
Damen Station:
- New substation construction
- Install rectifiers
- Install transformers
- Install AC & DC gear
- SCADA
- Construct aerial conduits/cable to elevated structure to switches/3rd rail
Barry Substation:
- New substation construction
- Install rectifiers
- Install transformers
- Install AC & DC gear
- SCADA
- Construct ductbanks to each air shaft down into subway
- Construct ductbanks/cable pulling in subway to tie into switches, 3rd rail, etc.
Haymarket Substation:
- Replace existing transformers
- Replace rectifiers
- Replace AC & DC gear
- SCADA
Canal Tie-House:
- Construction of prefabricated tie breaker house in subway connector tunnel
- Construct new DC gear
- SCADA
- Install 650' of ductbank and associated cable pulling with risers to elevated tracks
- Install 350' of conduit attached to elevated tracks
Belmont Crossover:
- Replacement of existing Belmont Crossover & approach track
- Demo existing traction power ductbanks & replace
- Replace existing signal infrastructure
Have a Project in Mind?