Location
Momence, IL
Timeline
2024
Client
City of Momence
PROJECT OVERVIEW
About This Project
John Burns Construction Company successfully completed the removal and replacement of a critical clarifier system as part of a water treatment facility upgrade. The scope included installation of a new clarifier, scum trough, skimmer blade, bridge/walkway extension, and center pier with drive assembly. Due to the operational demands of the facility, the project required a highly compressed schedule. All new equipment had to be delivered and staged prior to taking the existing system offline. Once the clarifier was shut down, the John Burns team executed the complete removal and installation within an accelerated two-week window, ensuring minimal disruption to the plant’s operations.
Markets
Water Management
Need a Similar Solution?
Contact our Illinois team to discuss your infrastructure project requirements and get expert guidance.
Illinois
Scope Of Work
- Removed existing clarifier system
- Installed new clarifier and associated components
- Installed scum trough, skimmer blade, and center pier with drive assembly
- Extended bridge/walkway structure