
Location
Clarendon Hills, IL
Timeline
2022
Client
Chicago Transit Authority
PROJECT OVERVIEW
About This Project
John Burns constructed the outbound train shelter for the village of Clarendon Hills. The train station included numerous architectural details that required significant coordination with the architect and numerous mock-ups. These details include board-form finished concrete, exposed aggregate concrete flatwork, Brazilian cedar board finishes.
Markets
Transit
Need a Similar Solution?
Contact our Illinois team to discuss your infrastructure project requirements and get expert guidance.
Illinois
Scope Of Work
- Constructed concrete foundation and concrete exterior walls.
- Installed structural steel frame.
- Installed storefront exteriors.
- Installed TPO roof on exposed steel pan deck w/ green roof trays.
- Installed native landscaping.
- Constructed sidewalk with integrated electrical snowmelt system.
Have a Project in Mind?
Let's discuss how we can bring your Illinois infrastructure vision to life with our 120 years of expertise.


