Location
Chicagoland Suburb, IL
Timeline
2023
Client
Confidential
PROJECT OVERVIEW

About This Project

John Burns performed as an electrical subcontractor for a Chicagoland Data Center which is a ground up data center project completed in 2023 in a tight time frame and in a complex working environment. This was a completely new build, and site conditions changed daily due to weather conditions and other subcontractors working in similar areas. John Burns was able to complete our portion of the project safely as a subcontractor, within budget, on-time and with minimal (contractor generated) change orders.

Markets

Data Center Infrastructure
Need a Similar Solution?
Contact our Illinois team to discuss your infrastructure project requirements and get expert guidance.

Illinois

Scope Of Work

  • 5,100 LF of electrical duct bank installation
  • 4,375 LF of telecom duct bank installation 
    • excavation
    • concrete encasement
    • backfill
  • Installed 100,000 LF of PVC conduit for the electrical, telecommunications, site lighting and security duct banks.
  • Furnished and installed 8 large telecommunication vaults, 5 telecommunication manholes, 8 electric vaults and 4 electric manholes ranging in size from 4’x4’x4’ to 20’x10’x10’.